programs:fertilizer_programs [2023/02/24 07:42] marilisebester_gmail.comprograms:fertilizer_programs [2023/03/01 09:15] (current) – [Adding a Fertilizer Program to a Step] marilisebester_gmail.com
Line 109: Line 109:
  
 ====Fertilizer Pump Alarms==== ====Fertilizer Pump Alarms====
-H: “Fert Pump Start Delay (sec)” – Enter the pump start delay here  +  * H: “Fert Pump Start Delay (sec)” – Enter the pump start delay here  
-I: “Fert Pump Alarm Sensor” – Select the relevant sensor from the dropdown list  +  I: “Fert Pump Alarm Sensor” – Select the relevant sensor from the dropdown list  
-J: “Fert Pump Alarm Min” – Enter the min value allowed for sensor selected +  J: “Fert Pump Alarm Min” – Enter the min value allowed for sensor selected 
-K: “Fert Pump Alarm Max” – Enter the max value allowed for sensor selected+  K: “Fert Pump Alarm Max” – Enter the max value allowed for sensor selected 
 + 
 +=====Output Control===== 
 +{{ :programs:output_control.png?nolink&400|}} 
 +  * A: “Max Catchup (%)” –  
 +  * B: “Output Rate Control”  
 +    *  “Always On” – used during batching, keeps the dosing valve open 
 +    *  “Analog VSD Output” –  
 +    *  “Duty Cycle” – used during proportional dosing, opens & closed the dosing valves based on values entered in C – E 
 +    *  “Pulse Frequency” –  
 +    *  “On/Off Delay” – used during proportional dosing, opens & closed the dosing valves based on values entered in C - E 
 +  * C: “Min Injector Off Delay (sec)” –  
 +  * D: “Min Injector On Delay (sec)” –  
 +  * E: “Control Cycle Duration (sec)” –  
 + 
 +======Adding Fertilizer to Valve Program====== 
 + 
 +=====Adding a Fertilizer Program to a Step===== 
 +Each “Step” has provision to add Fert Programs. 
 +{{ :programs:fert_to_step.png?nolink&400 |}} 
 + 
 +  * A: To add a Fertilizer program to the Valve Program, click on the “+”  
 + 
 +{{ :programs:fert_step_details.png?nolink&400 |}} 
 + 
 +  * As seen above, you can now enter the following specifications: 
 +    * "Liters" - if dosing according to a batching method 
 +    * "L/m3" - if dosing according to a proportional method 
 +    * "EC" - if dosing to maintain a certain EC 
 +    * "Pre-Delay" - duration of time that must pass from start of irrigation until fert program starts 
 +    * "Post-Delay" - duration of time that the fert program must stop before the irrigation program stops 
  
programs/fertilizer_programs.1677224535.txt.gz · Last modified: 2023/02/24 07:42 by marilisebester_gmail.com