User Tools

Site Tools


programs:fertilizer_programs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
programs:fertilizer_programs [2023/02/24 07:44] marilisebester_gmail.comprograms:fertilizer_programs [2023/03/01 09:15] (current) – [Adding a Fertilizer Program to a Step] marilisebester_gmail.com
Line 126: Line 126:
   * D: “Min Injector On Delay (sec)” –    * D: “Min Injector On Delay (sec)” – 
   * E: “Control Cycle Duration (sec)” –    * E: “Control Cycle Duration (sec)” – 
 +
 +======Adding Fertilizer to Valve Program======
 +
 +=====Adding a Fertilizer Program to a Step=====
 +Each “Step” has provision to add Fert Programs.
 +{{ :programs:fert_to_step.png?nolink&400 |}}
 +
 +  * A: To add a Fertilizer program to the Valve Program, click on the “+” 
 +
 +{{ :programs:fert_step_details.png?nolink&400 |}}
 +
 +  * As seen above, you can now enter the following specifications:
 +    * "Liters" - if dosing according to a batching method
 +    * "L/m3" - if dosing according to a proportional method
 +    * "EC" - if dosing to maintain a certain EC
 +    * "Pre-Delay" - duration of time that must pass from start of irrigation until fert program starts
 +    * "Post-Delay" - duration of time that the fert program must stop before the irrigation program stops 
  
programs/fertilizer_programs.1677224697.txt.gz · Last modified: 2023/02/24 07:44 by marilisebester_gmail.com

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki