User Tools

Site Tools


programs:fertilizer_programs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
programs:fertilizer_programs [2023/03/01 09:08] marilisebester_gmail.comprograms:fertilizer_programs [2023/03/01 09:15] (current) – [Adding a Fertilizer Program to a Step] marilisebester_gmail.com
Line 127: Line 127:
   * E: “Control Cycle Duration (sec)” –    * E: “Control Cycle Duration (sec)” – 
  
-=====Adding Fertilizer to Valve Program=====+======Adding Fertilizer to Valve Program======
  
-====Adding a Fertilizer Program to a Step====+=====Adding a Fertilizer Program to a Step=====
 Each “Step” has provision to add Fert Programs. Each “Step” has provision to add Fert Programs.
 +{{ :programs:fert_to_step.png?nolink&400 |}}
 +
   * A: To add a Fertilizer program to the Valve Program, click on the “+”    * A: To add a Fertilizer program to the Valve Program, click on the “+” 
  
 +{{ :programs:fert_step_details.png?nolink&400 |}}
  
-{{ :programs:fert_to_step.png?nolink&400 |}}+  * As seen above, you can now enter the following specifications: 
 +    * "Liters" - if dosing according to a batching method 
 +    * "L/m3" - if dosing according to a proportional method 
 +    * "EC" - if dosing to maintain a certain EC 
 +    * "Pre-Delay" - duration of time that must pass from start of irrigation until fert program starts 
 +    * "Post-Delay" - duration of time that the fert program must stop before the irrigation program stops 
  
programs/fertilizer_programs.1677661730.txt.gz · Last modified: 2023/03/01 09:08 by marilisebester_gmail.com

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki