programs:valve_programs
Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
programs:valve_programs [2022/11/29 10:31] – created marilisebester_gmail.com | programs:valve_programs [2025/01/20 07:09] (current) – [Scheduling] marilisebester_gmail.com | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Programs - Valve Program ====== | ====== Programs - Valve Program ====== | ||
+ | =====Trouble Shooting===== | ||
+ | If the valve program does not want to save & give an error " | ||
+ | * Signal Strength might not be strong enough to sync succesfully, | ||
+ | * If still not succesfull, check if both Farmsync hotspots are available, if not, do a power cycle. | ||
+ | * What is a "Power Cycle"? | ||
+ | * Please note that it will take a few minutes for all the controllers to come back online. | ||
+ | |||
+ | =====Limits===== | ||
+ | * Any changes made to existing valve programs must be made when the valve program is NOT Running. | ||
+ | * Refresh the Base Station after ANY changes are made to ensure that the update information is sent to the server. | ||
=====Program Details===== | =====Program Details===== | ||
Line 7: | Line 17: | ||
{{ : | {{ : | ||
- | |||
* **A:** Enter a name for the program | * **A:** Enter a name for the program | ||
Line 47: | Line 56: | ||
* Post-Delay: 10min | * Post-Delay: 10min | ||
* Thus, total **Fert** Runtime = 40 min | * Thus, total **Fert** Runtime = 40 min | ||
+ | **Note:** To undo a Group, simply click on any of the up or down arrows located just above the Fertigation programs to the right | ||
=====Scheduling===== | =====Scheduling===== | ||
Line 60: | Line 69: | ||
* **E:** Tick the Days of the Week that the program must run on | * **E:** Tick the Days of the Week that the program must run on | ||
- | ====Auto Scheduling==== | + | **Ammendment** |
+ | |||
+ | {{ : | ||
+ | * **A** If a program is running and a new schedule is sent from AgriWiz, this setting will stop the current irrigation and reset the schedule so that the new schedule can populate | ||
+ | * **B** Late Start (Loadshedding) if the schedule has fallen behind allow it the catch up (will only work if there is enough hours left in the day). | ||
+ | * **C** Force Stop ( If the schedule is running behind and the next schedule must start this wil Stop the program and reset the schedule so that the next schedule can start (WILL LOSE THE Irrigation Time that was left) | ||
+ | |||
+ | ====Auto Scheduling==== | ||
+ | |||
+ | - Only when using 3rd party schedulers | ||
{{ : | {{ : | ||
Line 133: | Line 151: | ||
* **E:** Enter a min Active time for the trigger | * **E:** Enter a min Active time for the trigger | ||
* **F:** Select a trigger type from the dropdown list | * **F:** Select a trigger type from the dropdown list | ||
+ | |||
+ | =====Events===== | ||
+ | {{ : | ||
+ | |||
+ | * **A:** Select from the dropdown list a program that must be started along with this Valve Program | ||
+ | * **B:** Select from the dropdown list a program that must be started once this Valve Program has stopped | ||
+ | |||
+ | =====Switching Control===== | ||
+ | |||
+ | {{ : | ||
+ | |||
+ | * **A:** Enter the duration of time (seconds) that must pass between each valve before the next is opened |
programs/valve_programs.1669717875.txt.gz · Last modified: 2022/11/29 10:31 by marilisebester_gmail.com