User Tools

Site Tools


programs:valve_programs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
programs:valve_programs [2022/12/08 05:31] – [Steps] marilisebester_gmail.comprograms:valve_programs [2025/01/20 07:09] (current) – [Scheduling] marilisebester_gmail.com
Line 1: Line 1:
 ====== Programs - Valve Program ====== ====== Programs - Valve Program ======
  
 +=====Trouble Shooting=====
 +If the valve program does not want to save & give an error "Station has not been able to sync successfully"
 +  * Signal Strength might not be strong enough to sync succesfully, just keep on trying to save until succesful.
 +  * If still not succesfull, check if both Farmsync hotspots are available, if not, do a power cycle. 
 +  * What is a "Power Cycle"? - When you remove the ALL power from the Farmsync Controller AND any external router that might be in the office, and then reconnect
 +  * Please note that it will take a few minutes for all the controllers to come back online.
 +
 +=====Limits=====
 +  * Any changes made to existing valve programs must be made when the valve program is NOT Running.
 +  * Refresh the Base Station after ANY changes are made to ensure that the update information is sent to the server.
  
 =====Program Details===== =====Program Details=====
Line 7: Line 17:
  
 {{ :programs:valve_details.png?nolink&400|}} {{ :programs:valve_details.png?nolink&400|}}
- 
  
   * **A:** Enter a name for the program   * **A:** Enter a name for the program
Line 60: Line 69:
   * **E:** Tick the Days of the Week that the program must run on   * **E:** Tick the Days of the Week that the program must run on
  
-====Auto Scheduling====+**Ammendment** 
 + 
 +{{ :programs:auto_schedule.png?nolink&400 |}} 
 +  * **A** If a program is running and a new schedule is sent from AgriWiz, this setting will stop the current irrigation and reset the schedule so that the new schedule can populate  
 +  * **B** Late Start  (Loadshedding) if the schedule has fallen behind allow it the catch up  (will only work if there is enough hours left in the day). 
 +  * **C** Force Stop  ( If the schedule is running behind and the next schedule must start this wil Stop the program and reset the schedule so that the next schedule can start (WILL LOSE THE Irrigation Time that was left) 
 + 
 +====Auto Scheduling====  
 + 
 +- Only when using 3rd party schedulers
  
 {{ :programs:auto_scheduling.png?nolink&400|}} {{ :programs:auto_scheduling.png?nolink&400|}}
programs/valve_programs.1670477484.txt.gz · Last modified: 2022/12/08 05:31 by marilisebester_gmail.com

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki