control:programs
This is an old revision of the document!
Table of Contents
Control - Programs
- A: Program Name
- B: Station Name
- C: Scheduled Start Time & Date
- D: Scheduled End Time & Date
- E: Total Runtime (minutes)
- A: “Play” - Press this button to start the program
- B: “Pause” - Press this button to pause the program
- C: “Stop” - Press this button to stop the program
- D: “Settings / Gear Icon” - Press this button to enter the setup page for the specified program
- E: “Synchronize Station” -
Steps
Clicking the arrow button on the left side of the program name will expand the program to view more detail:
- A: Here you van view all the steps that make up the Valve Program. It is also indicated which steps are Grouped together.
- B: The step that is running will automatically expand to give live readings of:
- Valve Name
- Runtimes (min)
- Flow rate (m3/h)
- Status
- Moisture %
- C: List of pumps in the program, each indicating:
- Pump Name
- Status
- Current (Amps)
- Pressure (Bar)
- D: Should the program include Fertigation, the following fields will be available to see:
- Fertilizer name
- Status
- Flow Rate (L/h)
- Injection Rate (L/m3)
- Current Total (L)
- Requested (L/m3)
- Tank Level (L)
- Out (%)
- EC
Flow Control
To the right, you will be able to see the above “Expected” & “Actual Flow Rates” of the program.
Sensors
All the sensors connected to the Controller active during this program will be listed to the right, along with their values.
Pump Details
control/programs.1669378282.txt.gz · Last modified: 2022/11/25 12:11 by marilisebester_gmail.com